The project is building a state-of-the art Elementary school Create a detailed p
The project is building a state-of-the art Elementary school
Create a detailed p
The project is building a state-of-the art Elementary school
Create a detailed project scope statement.
Based on the project scope statement, create a work breakdown structure (WBS).
Please go to the Internet for templates or documents that can help you meet the requirements.
The templates or documents that you use must meet all criteria specified in the grading rubric.
Paper Structure requires:
▪▪Introduction▪
Project Scope Statement- ▪Project scope description that is in more detail from the project charter.•Acceptance criteria specifying a set of conditions that must be met before deliverables are accepted.•Project deliverables that correlate to the WBS tasks that are required to be produced to complete the project’s product. Project exclusion(s) that identify what is expressly excluded from the project (What constitutes “out of scope”?).•A list and description of known constraints impacting scope▪
Work Breakdown Structure (WBS)- ▪WBS:•A hierarchical decomposition of the total scope of the project to be carried out by the project to accomplish project objectives according to required deliverables. •Each descending level of work item, with the lowest level being the work package, represents an increasingly detailed definition of the project work.• Work packages are accurate and assignable. There are no overlaps in scope definition between components of the WBS.•Identify which elements of the WBS will be measured as a control account. Control account has a control number that uniquely identifies it for hierarchical summation of costs, schedule, and resource allocation.▪
Conclusion▪
References